w3c
Reset Setting Change font size to lower sizeChange font size to original sizeChange font size to large size
    T
    T
    T
    T
    T
    T
Dam1-edited.jpg
dam21.jpg
Design_1.jpg
Design_2.jpg
Design_3.jpg
Design_4.jpg
Official Portal for
Department of Irrigation and Drainage
Ministry of Energy Transition and Water Transformation
Most View

Mobile Application

information for

Hydrological Data

Dec 05, 2016 - All users are requested to fill in the appropriate application forms. The forms Borang DI.1 or Borang DI.2) are available in word format for user to print. In the next step, user can either fax the appropriate completed form to the above address or send it via E-mail. It is recommended that user refers to our station inventory in order to determine the stations and period of data availability required during the process of filling-up the form (RHN Inventory Station). In the event ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/857

River Reserves Guidelines

Dec 05, 2016 - River Reserves Guidelines   GUIDELINE FOR: Pembangunan Melibatkan Sungai dan Rizab Sungai  
Tags matched : information for
└https://water.gov.my/index.php/pages/view/854

Stormwater Management Guidelines for Housing Developers

Dec 05, 2016 - Stormwater Management Guidelines for Housing Developers The following design acptance criteria are mandatory requirements for the planning and design of stormwater management systems for new urban developments, and for the upgrading of stormwater systems in existing urban areas.  
Tags matched : information for
└https://water.gov.my/index.php/pages/view/850

Tender Notices

Dec 05, 2016 - Tender Advertisement Tender Schedule Successful Tenders/Quotation in Year Guideline for Tender Prepared by Bahagian Ukur Bahan dan Kontrak Jabatan Pengairan dan Saliran Malaysia DISCLAIMER : The Government and the Quantity Surveying Division shall not be liable for any loss or damage caused by the usage of any information obtained from this web site. Companies referred to in this web site shall not be construed as agents nor as companies recommended by the Quantity Surveying Division ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/848

General Information

Dec 05, 2016 - Overview Sistem Maklumat Perunding (SMAP)- Company Profile Only Coastal Development Guidelines Tender Notices Stormwater Management Guidelines For Housing Developers River Reserves Guidelines Hydrological Data    
Tags matched : information for
└https://water.gov.my/index.php/pages/view/845

Bertam - Kepala Batas Flood Mitigation Project

Dec 05, 2016 - Bertam - Kepala Batas Flood Mitigation Project 1.0: Location Northern part of Seberang Prai District in Penang covering the Kepala Batas town, Ladang Bertam, Lahar Ikan Mati and Kg. Tok Bedu. 2.0: Background The northern part of Seberang Perai is fast developing and becoming the center of administration, educational and industrial region. However, it is often affected by floods which normally occured during the monsoon season from April to May and September to November, yearly. The worst floods ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/843

MSC Flood Mitigation Project

Dec 05, 2016 - MSC Flood Mitigation Project 1.0: Background The Multimedia Super Corridor (MSC) is an area covering about 15 km in width and 50 km in length. It extends southwards from Kuala Lumpur (KLCC), encompassing the new federal administratrative capital of Putrajaya coordination and implementation, the MSC is subdivided into seven planning areas as outlined below: i) Putrajaya; ii) Airport City; iii) Cyberjaya; iv) Cyber Village; v) Tele-Suburbs; vi) Research and Development Centre; and vii) High - ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/841

Sg Perai Flood Mitigation Project

Dec 05, 2016 - Sg Perai Flood Mitigation Project 1.0  Background    RTB Sg. Perai was implemented in RMK-8 and continue in RMK-9. The Sungai Perai catchment has an area 505km2 which comprises 5 tributaries. There are Sg. Kulim, Sg. Jarak, Sg. Kereh, Sg. Pertama/ Derhaka and Sg. Maklom/ Tok Sani. The catchment area at the upstream are hilly and green area. While the downstream of the river are muted and muddy. This is because of rapid development in that area. The frequent flood causes damage ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/839

Sg Muda Flood Mitigation Project

Dec 05, 2016 - Sg Muda Flood Mitigation Project   Background Sg. Muda, which is located within the boundary of Kedah and Pulau Pinang with a catchment area of 4,210 km2 and 180 km length begin from Muda Dam and flows across district of Baling, Sik and Kuala Muda. Water supply for agricultural, industrial and domestic sector for both Penang and Kedah is the key role of the river. The catchment often being flooded on the rainy season from April to May and from September to November every year. Many ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/837

Batu Jinjang Ponds & Related Diversions

Dec 05, 2016 - Batu Jinjang Ponds & Related Diversions Background  The Klang Valley is the most developed area in Malaysia, especially at the city of Kuala Lumpur. Due to the rapid development and urbanization, flooding problems in the Kuala Lumpur city center have become more frequent and severe. It has been recognized that from the flooding events happened on 26th April 2001 dan 29th October 2001, the Sungai Klang stretch between Tun Perak bridge and Dang Wangi bridge is badly flooded where the ...
Tags matched : information for
└https://water.gov.my/index.php/pages/view/835